- Pipe for HDD Directional Boring project Willard Missouri.
- HDD Directional Boring in Republic Missouri.
- Installing 6 in gas pipe for City Utilities
- We put 400 feet of 12″ water pipe in a day. Everyone worked some long hours and did a great job
- Finished a pretty long job today. Feels good
- Exposing a water pipe in rock in Noal Missouri.
- Back at it in Oklahoma
- They forgot to put in the water pipes when they poured the foundations. This job there are 48 new housing units they forgot to place the water lines before they were built. We are placing 24 8 inch and 24 4 inch
- A new core drill. We core drill through the asphalt and vacuum excavate to expose utilities safely.
- This job there are 48 new housing units they forgot to place the water lines before they were built. We are placing 24 8 inch and 24 4 inch